Biomass and CBG plants, built to run every day.

KSR Green Bharat plans, installs and maintains biomass pellet, briquette and compressed biogas (CBG) plants, and keeps them supplied with fuel. Engineers based in Kota, Rajasthan, with plants in 10 states.

  • Plants in 10 states
  • Setup, O&M and fuel from one team
  • Engineers you can call directly
10states with KSR plants
6services under one team
4stages, feedstock to fuel
1point of contact for your plant

One team from first site visit to everyday operations.

Most biomass projects fail in the gaps between feedstock, machinery and the people running the plant. We take responsibility for all three, so you deal with one team instead of five vendors.

Biomass pellet plant with a pellet mill, cyclone, silos and conveyor, with piles of raw biomass and finished pellets

Biomass plant setup

Pellet and briquette plants planned around your feedstock, site and budget, then installed and commissioned by our engineers.

  • Feedstock study and capacity sizing
  • Machinery selection and plant layout
  • Installation, trial runs and commissioning
Steel pipework and machinery inside an industrial plant

Turnkey execution

A fixed scope, one point of responsibility and a documented handover.

Technician maintaining plant equipment

Operations & maintenance

Trained operators and planned maintenance of dies, rollers and dryers.

A large pile of biomass pellets under a conveyor inside a pellet plant shed

Fuel supply & management

Pellets, briquettes and raw biomass matched to your boiler or kiln.

Aerial view of a biogas plant with round digester tanks

CBG installation & consultancy

Compressed biogas projects from feedstock plan to commissioning.

Valve and pressure meter on industrial machinery

Technical consultancy

An engineer's audit of a plant that is underperforming or being planned: process and equipment review, moisture, ash and output troubleshooting, and a costed list of what to fix first.

Book a plant audit
Map of India with the 10 states where KSR Green Bharat has plants highlighted: Rajasthan, Uttar Pradesh, Madhya Pradesh, Maharashtra, Telangana, Karnataka, Tamil Nadu, Haryana, Punjab, Uttarakhand

Plants running in 10 states.

From the mustard belt of Rajasthan to the sugar and paddy regions of the south, KSR plants work with the residue each region grows. Tap a pin to see the state.

  • Rajasthan
  • Uttar Pradesh
  • Madhya Pradesh
  • Maharashtra
  • Telangana
  • Karnataka
  • Tamil Nadu
  • Haryana
  • Punjab
  • Uttarakhand

Inside a pellet mill: residue in, fuel out.

Crop residue is dried and ground, then pressed through a turning ring die by heavy rollers. What comes out is dense, uniform fuel that replaces coal. We set up every stage of this line and keep it running.

  1. FeedDried, ground residue enters the hopper.
  2. PressRollers force it through the ring-die holes.
  3. PelletsFuel pellets leave the die, cool and are bagged.
Plan your plant with us
Animated pellet mill Crop residue falls into a hopper, a ring-die press turns it into pellets, and the pellets ride a conveyor and pile up at the end. Crop residue in Ring-die press Fuel pellets out

How a KSR project runs.

Every plant starts with the material, not the machine. The order below is the order we work in on every project.

  1. Study the feedstock

    Which residues grow near your site, in which months, at what moisture and price. This decides pellets, briquettes or CBG.

  2. Size and design

    Capacity, drying, size reduction and densification matched to the feedstock. You get a layout, machinery list and budget first.

  3. Install and commission

    Our engineers coordinate vendors, run trial batches and train operators until the plant reaches rated output.

  4. Operate and supply

    After handover we can run the plant, maintain it and keep feedstock and fuel moving under a monthly contract.

Why now is the time to build.

Demand for biomass fuel and biogas in India is growing fast. These are national figures from independent sources, not KSR results.

India's CBG project pipeline

Projects tracked by stage, as of June 2026

Approved 48 Yet to start construction 777 Under construction 462 Commissioned 560

Source: Renewable Watch Research, 2026

42 GW of bio-power potential

All-India potential, by source

42 GW potential 28 GWbiomass 14 GWbagasse cogen

Source: NITI Aayog estimate, via Renewable Watch

Bio-fuel demand to 2030

India's liquid and gaseous biofuel use, today = 100

100 Today 150+ 2030 main 200+ 2030 faster

Source: IEA; main case grows more than 50%, faster-policy case more than doubles.

A green sapling growing out of a pile of biomass pellets

Powering a greener Bharat, one tonne at a time.

Every tonne of biomass pellets burned in place of coal turns crop residue into clean energy, instead of smoke from burning fields.

Start your green plant

Why plant owners choose KSR.

Most providers sell one piece of the project. KSR stays responsible from the first feedstock test to the fuel truck that leaves your plant.

  • One contract, whole plantSetup, operations, maintenance and fuel from a single team.
  • Engineers, not salespeopleAn M.Tech renewable energy lead and a mechanical engineer run every project.
  • Proven across 10 statesPlants running on different crops, climates and boiler types.
What you getKSR Green BharatTypical machine supplierTypical online consultant
Feedstock study before machines
Installation and commissioning on site
Operators trained at your plant
Monthly O&M contract
Fuel supply after handover
CBG project support
Engineers you can call directly

Pellets or briquettes?

Both replace coal in industrial boilers. The right one depends on how your boiler is fed and how far the fuel travels.

Biomass pellets
Biomass pellets
Wheat fields at harvest time in India
Crop residue for briquettes
Compared onBiomass pelletsBiomass briquettes
Typical size6–10 mm diameter60–90 mm diameter
Best forAutomatic feeding, thermal power co-firing, long-distance transportManually or grate-fed boilers, furnaces and kilns near the plant
Plant investmentHigher: finer grinding and dryingLower: simpler line, coarser material
Common inputsSawdust, crop residue, huskMustard husk, groundnut shell, sawdust, agro waste
Aerial view of a biogas plant with round digester tanks

Compressed biogas (CBG) projects.

CBG turns press mud, cattle dung, crop residue and food waste into a fuel that replaces CNG. We support developers from the feedstock plan through commissioning.

  1. 1Feedstock
  2. 2Digestion
  3. 3Upgrading
  4. 4Compression

Our scope covers site and feedstock assessment, technology and equipment coordination, installation supervision, commissioning and operator training.

Discuss a CBG project

After handover, we stay.

A plant earns money only on the days it runs. Our O&M contracts are built around uptime, not call-outs.

Preventive maintenance

Scheduled checks on dies, rollers, hammers, dryers and conveyors before they fail.

Trained operators

Operators placed and trained at your plant, with shift and safety routines.

Fast fixes

Engineers on call for breakdowns, with spares planned ahead.

Fuel in step

Feedstock buying and storage planned against your production schedule.

Talk directly to the engineers.

No call centre. Your enquiry goes to the two people who lead every KSR project.

Technician working on industrial equipment with protective gear
Energy consultancy

Sonu Choudhary

M.Tech in Renewable Energy. Leads feedstock studies, plant planning and CBG projects.

Engineering

Krishna Dev Hada

Mechanical Engineer. Leads installation, commissioning and plant maintenance.

Questions plant owners ask us.

Can't find yours? Call or WhatsApp the team.

What does KSR Green Bharat do?

KSR Green Bharat sets up, operates and maintains biomass pellet, briquette and compressed biogas (CBG) plants, and manages biomass fuel supply for industries. The team is based in Kota, Rajasthan.

In which states does KSR Green Bharat have plants?

KSR Green Bharat has plants in 10 states: Rajasthan, Uttar Pradesh, Madhya Pradesh, Maharashtra, Telangana, Karnataka, Tamil Nadu, Haryana, Punjab and Uttarakhand. New projects are taken up across India.

How much does a biomass pellet or briquette plant cost?

Cost depends on capacity, the feedstock, how much drying it needs and the level of automation. Briquette plants usually need less investment than pellet plants. Share your feedstock, location and target output and we will send a costed estimate.

Which raw materials can be used?

Common inputs are mustard husk, soybean straw, paddy and wheat straw, groundnut shells, cotton stalk, bagasse and sawdust. We test moisture and ash content before recommending pellets or briquettes.

Can you take over operations and maintenance of an existing plant?

Yes. We review the plant, fix the immediate problems and can then run it under a monthly O&M contract with trained operators, preventive maintenance and spares planning.

Do you supply biomass fuel to industries?

Yes. We arrange pellets, briquettes and raw biomass for boilers, furnaces and kilns, with storage and a delivery schedule matched to your consumption.

Is government support available for biomass and CBG plants?

Central schemes from MNRE support briquette and pellet plants, and the SATAT initiative supports CBG offtake. Terms change, so we check your eligibility during project planning.

What should I share when I enquire?

Your site location, available feedstock, expected capacity, timeline and any equipment or drawings you already have. You can start the conversation even if some details are still open.

Tell us about your plant.

New project, a plant that needs fixing, or a fuel requirement. Share what you know and an engineer will reply within one working day.

Project enquiry

Fields marked * are required.